Roster period AUG 2026
Compliance Overview
Every published roster is evaluated against the nine training compliance categories. Breaches and at-risk conditions stay open until the roster itself is rectified.
Engine live · evaluating CMS roster feed
Category board
Nine compliance categories, owned by the responsible training team.
20 shown
| Severity | Trainee | Category | Event | Deadline | Window | Owner | Status |
|---|---|---|---|---|---|---|---|
| Breach | Devansh Puri TRN-10301 · FUT · CCU | ZFTT / SLF C2 | ZFTT sequenced before Skill Test Night ZFTT must occur after Skill Test Day and Skill Test Night. | 28 JUL 26 | 17d overdue | Sim Training | new |
| Breach | Arjun Deshpande TRN-10334 · SFO · HYD | Route Checks C1 | CCJ Route Check (Day) — RC/N missing Night Route Check must be completed. | 02 AUG 26 | 12d overdue | Line Training | new |
| Breach | Sanya Gill TRN-10293 · FO · DEL | Annual LC C3 | ALC 04 AUG with TRE Kohli (prev. 19 NOV 2025) Annual Line Check cannot be performed with the same trainer within 365 days. | 19 NOV 26 | 10d overdue | Line Training | new |
| Breach | Priya Nambiar TRN-10345 · FUT · MAA | Unfit C9 | Medical Class 1 expired 09 AUG — rostered 15 AUG Mandatory document lapses. | 09 AUG 26 | 5d overdue | Training Admin | new |
| Breach | Tanya Fernandes TRN-10320 · FUT · BLR | Progress Checks C4 | Rostered SLF 62 in Phase 2 without Phase 2 entry sign-off Phase 1 → Phase 2 requires TA Sign Off — Phase 1. | 12 AUG 26 | 1d overdue | Training Admin | new |
| Breach | Rohan Bhatia TRN-10288 · CUT · HYD | Sequence C8 | FFS6 flown before FFS5 FFS1 → FFS8 must be flown in sequence. | 13 AUG 26 | 1d overdue | Sim Training | new |
| Breach | Aarav Mehta TRN-10241 · FUT · DEL | Safety Release C6 | SLF 36 on 16 AUG — no Safety Pilot rostered Non-Safety-Released trainees rostered for Line Training require a Safety Pilot. | 16 AUG 26 | 2d left | Line Training | new |
| Breach | Tanya Fernandes TRN-10320 · FUT · BLR | IR-Ops SP C7 | IR-Ops sector 18 AUG (VOBL LVP) — Safety Pilot missing Safety Pilot is mandatory during IR-Ops for CUT / FUT Line Training. | 18 AUG 26 | 4d left | Line Training | new |
| At Risk | Arjun Deshpande TRN-10334 · SFO · HYD | Annual LC C3 | ALC planned 27 AUG with TRI Sandhu (prev. 03 JAN 2026) Annual Line Check cannot be performed with the same trainer within 365 days. | 25 AUG 26 | 11d left | Line Training | new |
| At Risk | Nikhil Verma TRN-10312 · CUT · BOM | Progress Checks C4 | Release Check planned 29 AUG — sign-off pending PIC Route Check → Release Check requires TA Sign Off — Commence Release Check. | 27 AUG 26 | 13d left | Training Admin | new |
| Breach | Yash Chandra TRN-10358 · CUT · DEL | ZFTT / SLF C2 | T/L SIM shortfall after Additional ZFTT 30 days after Additional ZFTT → 3 T/L SIMs required in the preceding 30 days. | 04 AUG 26 | 10d overdue | Sim Training | acknowledged |
| Breach | Priya Nambiar TRN-10345 · FUT · MAA | Safety Release C6 | Safety Pilot not qualified — SLF 23 on 15 AUG The assigned Safety Pilot must be qualified. | 15 AUG 26 | 1d left | Line Training | acknowledged |
| At Risk | Meera Krishnan TRN-10277 · FUT · MAA | Progress Checks C4 | PIC RC planned 20 AUG — Phase 3 sign-off pending Phase 3 → PIC Route Check requires TA Sign Off — Phase 3 and Commence PIC RC. | 19 AUG 26 | 5d left | Training Admin | acknowledged |
| At Risk | Nikhil Verma TRN-10312 · CUT · BOM | Sequence C8 | PIC10 planned before PIC09 PIC01 → PIC10 must be flown in sequence. | 22 AUG 26 | 8d left | Sim Training | acknowledged |
| At Risk | Sanya Gill TRN-10293 · FO · DEL | Route Checks C1 | IXE Route Check (Day) planned 24 AUG If no Night RC, Night Observation must occur before Day RC. | 23 AUG 26 | 9d left | Line Training | acknowledged |
| At Risk | Rohan Bhatia TRN-10288 · CUT · HYD | ZFTT / SLF C2 | SLF start window closing — 60 day limit SLF must start within 60 days of Skill Test Day. | 23 AUG 26 | 9d left | Sim Training | acknowledged |
| At Risk | Aarav Mehta TRN-10241 · FUT · DEL | Unfit C9 | DG / SEP recurrent expires 25 AUG Mandatory qualification lapses. | 25 AUG 26 | 11d left | Ground Training | acknowledged |
| Breach | Zoya Ahmed TRN-10366 · FUT · CCU | PF SIM C5 | Additional PF SIM not planned post Phase 2 After Phase 2 Line Training is completed an additional PF SIM must be planned. | 15 MAY 26 | 91d overdue | Sim Training | actioned |
| Breach | Harsh Vardhan TRN-10372 · FUT · BOM | ZFTT / SLF C2 | ZFTT overdue — Skill Test Day 01 JUN ZFTT must be completed within 45 days of Skill Test Day. | 16 JUL 26 | 29d overdue | Sim Training | actioned |
| At Risk | Zoya Ahmed TRN-10366 · FUT · CCU | IR-Ops SP C7 | IR-Ops sector 21 AUG — SP qualification expires 20 AUG Missing or unqualified Safety Pilots are flagged. | 20 AUG 26 | 6d left | Line Training | actioned |