TOCCTraining Ops & Compliance
VS
Training Admin workspace

TA Sign Off

Phase gates cannot be crossed without a Training Admin sign-off. Every decision is stamped with the signatory and time, and open breaches must be cleared first.

Aarav Mehta

FUT
DEL
TRN-10241

Type Rating - A320 · started 12 JAN 26 · DOJ 03 NOV 25

Safety Release
Safety Pilot mandatory
Current phase
Line Training P1
Cumulative SLF
68.2 h (46.2 + 22.0 planned)
Cumulative PIC RC
0 (0 + 0 planned)
PIC assessment sim
Last training
SLF 34 (P1) · 11 AUG 26

Open compliance conditions

Breaches must be resolved before any further sign-off.

  • BreachC6SLF 36 on 16 AUG — no Safety Pilot rosteredALT-4114
  • At RiskC9DG / SEP recurrent expires 25 AUGALT-4122

Phase gates

Each gate unlocks only after the preceding sign-off.

0/5
  1. 1
    TA Sign Off — Phase 1
    Phase 1 → Phase 2
    Blocked by open breach
  2. 2
    TA Sign Off — Phase 2
    Phase 2 → Phase 3
    Previous gate pending
  3. 3
    TA Sign Off — Phase 3
    Phase 3 → PIC Route Check
    Previous gate pending
  4. 4
    Commence PIC Route Check
    Authorises PIC RC series
    Previous gate pending
  5. 5
    Commence Release Check
    PIC RC → Release Check
    Previous gate pending